Before the dismantling of the scaffolding equipment, the first step is to clear the space for keeping up the dismantled pieces.
Check each platform ensuring the wood platform is not damaged during construction.
Place all the necessary safety gear required.
Start the dismantling project from the top, and pass the materials from person to person in a chain formation.
The ties hold the structure of the building to be removed once the complete platform is removed.
Inspect all the components that are safely removed. Any damaged pieces should be stored aside and can be replaced for later use.
• Self-propelled fully remote-controlled for movement)
• Manual push- Pull ( Manually controlled movement)
• Rough terrain scissor lift (for uneven terrain/Surface)
During the delivery period it can take longer to deliver in unexpected circumstances, Please be patient…